log [2018/06/11 14:23] team1log [2018/06/15 23:18] (current) – [Activities] team1
Line 283: Line 283:
   * Proposition of soldering scheme has been presented to the supervisors. After feedback by Paulo, small corrections have been made to improve the soldering paths. The circuit has been executed the same day.   * Proposition of soldering scheme has been presented to the supervisors. After feedback by Paulo, small corrections have been made to improve the soldering paths. The circuit has been executed the same day.
  
 +==== 15th Meeting (2018-06-14) ====
 +=== Agenda: ===
 +  * Type of WiFi on the final presentation (credentials etc.)
 +  * Present current state of the project(flowcharts)
 +
 +
 +=== Minute: ===
 +  * We will use the university's WiFi for the final presentation and we got instructions about how to connect our device to that internet
 +  * Received feedback about the current flowcharts in the project and information about which other flowcharts to include
 +  * The supervisors told us the rules and the timespan of the final presentation
  
 ===== Activities ===== ===== Activities =====
Line 293: Line 303:
 | 19.03.2018 | 23.03.2018 | Detailed Drafts | Creating the 3D models about the prototype | Rodrigo | | 19.03.2018 | 23.03.2018 | Detailed Drafts | Creating the 3D models about the prototype | Rodrigo |
 | 24.03.2018 | 05.04.2018 | List of Materials | Preparing the list of materials needed | Everyone | | 24.03.2018 | 05.04.2018 | List of Materials | Preparing the list of materials needed | Everyone |
-| 06.04.2018 | 25.04.2018 | Providers | Finding the providers for the list of materials | Everyone |+| 06.04.2018 | 25.04.2018 | Provider searching | Finding the providers for the list of materials | Everyone | 
 +| 26.04.2018 | 20.05.2018 | Polishing and upgrading the report | Upgrading the report while waiting for the materials to be received | Everyone | 
 +| 21.05.2018 | 23.05.2018 | Design of the System | Designing the product based on the materials received | Everyone | 
 +| 22.05.2018 | 28.05.2018 | Server configuration | Configuration of the server to handle the device | Mile | 
 +| 22.05.2018 | | Backend programming | Programming the back-end application for the device | Mile | 
 +| 24.05.2018 | | Mechanics part | Assembling the mechanical parts of the prototype | Rodrigo and Andres | 
 +| 24.05.2018 | | Electronics part | Assembling the electronic parts of the prototype | Szymon and Andres | 
 +| | |Application programming | Programming the Android application | Szymon and Mile | 
 +|24.05.2018 | You can never finish testing | Testing | Testing if the system works as intended | Everyone |
  